
Downloads
|
 |

Beating the heat is no sweat with CBM’s D-Lay Set™. Easier pouring, pumping and finishing without adding water even in high ambient temperatures.
CBM’s D-Lay Set™ ready-mixed concrete stays fluid for placing without extra water in the mix, then sets up normally so your crews have the time to put on a great finish. Relief for your hot weather headaches. When temperatures rise over 25° C, pouring ordinary concrete is no picnic. Slump loss makes the mix harder to handle, the faster setup leaves less time for finishing and surface evaporation makes troweling difficult. To top it all off, the final result can be disappointing: porous, less durable concrete or even surface blemishes and cracking. With CBM’s D-Lay Set those hot weather headaches are history. Watered down mixes make weaker concrete. Don’t be tempted to put extra water in your mix to maintain slump. It might keep you pumping, but it comes at a price. You get lower quality concrete: lower compressive strength, faster wear and less watertightness. So think again: CBM’s D-Lay Set preserves slump and retards set without extra water.
- CBM’s D-Lay Set ready-mixed concrete takes the hassle out of summer concrete.
- No additional crew to handle stiff mixes or extra equipment to finish accelerated setups.
- No more multiple pours with too many cold joints.
|